Up To

Service (Call for >4,500 SqFt)

1,500 SqFt

2,500 SqFt

3,500 SqFt

4,500 SqFt

NC SOP Inspection

500

$565

$635

$720

Crawlspace, add

$95

$110

$120

$130

Built prior to 2017, add

$65

$90

$125

$160

Built prior to 2007, add

$115

$140

$175

$210

Built prior to 1992, add

$180

$210

$235

$270

Built prior to 1977, add

$235

$270

$300

$340

Built prior to 1962, add

$295

$350

$420

$510

Built prior to 1947, add

$400

$480

$600

$715

Detached Buildings (up to 400 SqFt)

$185

Detached Garage (no HVAC/Plumbing)

$300

Detached Buildings w/living area

$395

Anything with plumbing or HVAC

Pre-drywall (pre insulation, all sizes)

$500

Two days before Builder's Pre-drywall Walk Through

----------Subcontracted Services ------------

Radon

$150

Termite

$115

Additional Fee for Detached Buildings

Septic (Gravity,Pump)

$495

Alternative Systems, Call for Quote

With Septic / Without

Well Inspection, Coliform Bacterial

$185/$345

Coliform Only (5 to 7 business days)

Well Inspection & Full Panel Water Testing

$265/$430

FHA/VA/HUD Coliform,Lead,Nitrate,Nitrite (12 to 14 business days)

Well Inspection & Level I Water Testing

$415/$580

Above Plus Antimony, Arsenic, Barium, Beryllium, Cadmium, Calcium, Chromium, Copper, Iron, Magnesium, Manganese, Mercury, Nickel. Selenium, Silver, Sodium, Thallium, Vanadium, Zinc, Hardness (12 to 14 business days)

Note: Additional a small fee will apply for distance traveled > 20 miles from company address 12512 Bayleaf Church Rd, Raleigh.